精品日本一区二区三区四区,久久免费精品国产,亚洲一区二区三区中文字 ,人人妻人人澡人人爽秒播,久久青青草原国产最新片,亚洲欧美中文日韩视频,亚洲午夜久久久久无吗,日本道一区二区更新免费,精品日本亚洲一区二区三区,国产无套白浆一区二区在线观看

Two DATUM? compressor trains destined for BP’s Mad Dog 2 project in Gulf of Mexi

December 12, 2017
   Two compressor trains ordered for BP’s Mad Dog 2 project.
 
  The Dresser-Rand business will supply two low-pressure D6A4S DATUM compressors and two high-pressure D6R9B DATUM compressors for export gas service for BP’s Mad Dog 2 project in the deepwater Gulf of Mexico. The modular design of the DATUM compressor minimizes maintenance and reduces downtime.
 

 
  Each compressor train will be driven by a Siemens electric motor and includes a variable speed gearbox. The equipment is scheduled to ship in 2018, with oil production expected to begin late in 2021. Dresser-Rand has been a strategic supplier to BP since 2000 and supplied equipment for several of BP’s projects in the Gulf, including Mad Dog (Phase I), Thunder Horse, and Atlantis. The Dresser-Rand business has delivered nearly 50 compressors to BP worldwide over the years, with approximately half of these installed in the Gulf of Mexico.